Drive Smarter with Latest Auto News & Insights

Prithvi Highway Blocked: Major Landslide Disrupts Traffic

Last Updated on November 9, 2026 by alizni

Travelers and daily commuters in Nepal are currently facing significant disruptions as a major dry landslide has completely halted traffic on the vital Prithvi Highway. The incident, which occurred in the early hours of the morning, has left hundreds of vehicles stranded, highlighting the ongoing challenges of road safety and infrastructure maintenance during the region’s unpredictable weather cycles.

⚡ 100% Electric Bookings Open
Tata Punch EV

Tata Punch EV

Nepal’s favourite micro-SUV, reborn electric. Bold looks, zero emissions, everyday thrills.

🔋 Up to 421 km range ⚡ Fast charging 🛡️ 8-yr battery warranty
Book Your Punch EV Now →

Authorized dealer · Sipradi Trading

The Incident at Ghoptebhir

The blockage was reported at Ghoptebhir, located in Ichhakamana Rural Municipality-4 of Chitwan district. According to local authorities, a sudden dry landslide descended onto the road at approximately 5:00 AM, dumping a massive volume of debris, rocks, and soil across both lanes of the highway. Because the road is a critical artery connecting the capital, Kathmandu, with the rest of the country, the impact was felt almost immediately, leading to a massive traffic bottleneck extending for several kilometers in both directions.

Ongoing Challenges in Clearing the Debris

Despite the urgency of the situation, clearing operations have been hampered by the nature of the terrain. Even after six hours of intensive monitoring and initial response efforts, the highway remained impassable. Local police and district traffic authorities have been working around the clock to coordinate the removal of the debris. However, the instability of the hillside at Ghoptebhir presents a significant risk to the cleanup crews. Heavy machinery is being deployed, but safety protocols must be strictly followed to ensure that the clearing process does not trigger further rockfalls or secondary slides.

Impact on Travelers and Supply Chains

The Prithvi Highway is the primary route for the movement of essential goods, including fuel, food supplies, and industrial materials. A closure of this duration inevitably impacts the supply chain, causing delays in logistics and increasing the cost of goods as vehicles are forced to wait or take long, arduous detours. For passengers traveling by bus or private vehicle, the situation is even more challenging. With no immediate timeline for reopening, many commuters are stuck in their vehicles with limited access to resources, waiting for the green light from traffic police.

Road Safety and Future Precautions

This incident serves as a stark reminder of the vulnerability of Nepal’s mountain highways. While dry landslides can occur without the direct influence of heavy rainfall, they are often the result of geological instability and erosion over time. As travelers, it is essential to stay updated through official social media channels of the Nepal Traffic Police and local district administrations before planning a trip along this route. Authorities are currently advising motorists to postpone travel plans if possible or to seek alternative routes if they are available, though options for heavy transport are severely limited.

Conclusion

As recovery efforts continue at Ghoptebhir, the priority remains the safety of all commuters and the workers clearing the highway. While the six-hour mark has passed without a resolution, authorities are hopeful that the road will be cleared for at least one-way traffic as soon as the area is deemed stable. In the meantime, patience and caution are advised for all those currently navigating the region’s road network. Stay tuned to local news outlets for the latest updates on the reopening of this vital transport link.

Visited 13 times, 13 visit(s) today